Pamela-like New Work Out Yes Pamela-like Work Out (High-performance 8 way-time bell-shaped block) updated version. Controllable LFO waveforms, non-adjustable modifiers, Wu Ikuri Rokubetsu, Yatsutsudo deposits, and free distribution CVs, etc. Simultaneous holding, homologous manipulability and operability. NGK OLED. In addition to this, it is possible to connect and convert Din Sync Japanese MIDI at the time of export.
10-300 BPM
Qualification mark can be set up8 bellsExport volume
Due to the installation of a repair device / 512 to x48,Split modifierSelectable
At the time of export, it is a simple gate, a simple triangle, a sine wave, an envelope, and a machine.Various waveformsExportable
Adjustable gate altitude, pulse intensity, slope, etc.
The reason for setting the bells when setting up the reason, the reason for specifying the cause, and the time when the appearing tools have a uniform interval. Totally outside, passing per nth post-primary export, can be proceeded and set multiple widths.
Mr. Shio's rank jumpPassage filter export Super-exit bell-like section sequence
CV importLiable distribution and individual export-oriented ownership. The target of distribution of individual items is established.
Root exporterDetention of all stations
Time movement / stop / replacement / speed can be passed or manual control
48-1 PPQN-like external time bell
ChatteringSpreaderCan export DIN same step MIDI time bell. (Pexp-1/Pexp-2)
On-board USB endorsement update
In each of the individual signs
How To Use
Basic operation
Outside the bell Pamela's external cadence, same external contractor's external cadence import to the upper left Clock import. Required external bell accuracy precision renewal 24PQN, status indication BPM laying off program at approximately 1 second bell. Other than that, imported. Operation at the time of high traffic during the period due to the import of time bells. Established roots, imported normal rehabilitation works for other people.
BPM display pattern Japanese modifier code display pattern BPM for connection power supplyBPM display patternCorrect. 將 EDIT 碼 器 從 BPM 硯 显示 方 轉Modifier screen, CH2 repair and upgrade equipment model ...
ModifierHourly and minute frequency factor. At the time of BPM at the time of the BPM, the speed of the bell, the setting of the number of the individual roads, x times the sum of 1 / x times, the time of the pamelation in Pamela, the export base of the music, the x times the sum of the times 1 / x times the times . The number of bells in the hour, the number of bells in the 16th take-out, the modifier "/ 16"; The triple method, the modifier "* 3". New Pamela 允 傁 您 选择 Non-constant qualifiers or more support 點 狀 Note Japanese tuplets. The qualified modifier x = 1. Ryouka BPM = 120, Rikiki Kane per second export.
BPM Wako Reformer type Under the BPM or the roadway modification device display model, the application of switching of the knitting device is edited.
BPM Indicating modelBPM editing model, BPM after rotating knitting device, BPM display model after returning from knitting device.
In-service remodeling deviceModifier versionIt is a movement-like edition. Completed "/ 16" Japanese "* 1.3" Specially installed under the special qualification code.
-Opening or closing all the time
-Export pulse at the beginning of installation
-Export pulse when installation is stopped
Ryokan selection "CV1" or "CV2", rule can use CV progress control. Independent ownership of individual roads and other CV restraints used by others. Set up to reduce shifts and weaknesses. Possible, due to consolation of CV.
Outside the bell It's just before the end of the story. The main steps are the same as the external bells, the contractor's bells are "Clk", the BPM display type model is based on the apportioning device, the selection "PPQN" is installed, and the proper PPQN is installed. A detailed PPQN-like credibility, a bottom-level "BPM display schematic detailed setup".
Advancement setting
Under BPM or taido road rehabilitation device type pattern, anazumi version, silling machine accessible approach pattern, and more detailed information.
BPM layout model Detailed installation below Under the model of BPM display in BPM, it is possible to pass through, and set up all the stations, and the equipment is maintained and managed.
PPQN:External bell bell chord note length Transcript 24PPQN (per quarter note 24 pulse), one kind of installation, 24 imported at the time of external bell pulse installation, quarter note length. For DIN SYNC etc. Bell equipment is installed here. Four 16-note bells at the time of the 4th-note note used at the time of the bell, 4PPQN by the contractor, the quarter note at the cause.
Service? Installation RUN Import control Inhibitory gate RUN / STOP (backward) Return reimbursement Import
Save:Pre-owned eight roads have been established and preserved.
High-class installation under the model Under the model of the repair and repair device, the details of the installation of the device that can be used by the residents are detailed. Other than the repair device, normal management and individual management.
Waves: Xiamen / Triangle / Sine / Envelope / Electrical selection waveforms in the machine. When exporting one corrugated product
grade:0-100% (100V for 5%) due to the installation of Kaneden mountain peaks when exporting
width:Installed export waveform frequency. Waveform correction gate (square) other than LFO waveformShapeNormal use, smooth shape. For example: triangular wave → sawtooth wave. Waveform waveform envelopeTimeInstallation
Stairs:Shifted export waveform. Immediate messenger time interval homology, Tokiya Tokiya
Error:Time bell export time Introduction No. No. XNUMXst Dly / No.
Dly /:Specified postponement time Bell frequency at postponement. Due to repair and modification equipment * 4 (or * 2) and Dly / Due to 2 o'clock, start at 0, increase “Deferred” supervised delivery typical volley
Slope rate:Can be installed timed wave width
EStep: Pamela-like New Workout Possible Passing Exports. At this time, the Elongation of the cyclical time period is designated as Estep. ERot 允 您 Renewal Circular opening
Circulation:Can be installed before reinstatement. Applicable to crawlers.
Save: 26x8 sardine tank a1 to z8 currently in place. 從 a 到 z 對 aoat Global Bank. When the storage tank reaches c8 and the tank passes through simultaneously, the BPM screen is displayed and the model is distributed.
load:從 a1 ~ z8 Set up a neutral road
Stacked:Established a tatami road.Installed for a double-placed installation.
Restraint Passed through Refurbishment equipment Japanese high-class installation Visited “preservation / addition / overlaying” out-of-home, own-owned-town distribution distribution CV pending. Attenuator, shift amount, etc. can be installed. One CV can Distributor with or without Attenuvert Amount of sum deviation. CV1 Shokyo-o Shoden.
CV1 or CV2 required for distribution CV, contractor editing device or other screens installed. In addition to this, it is possible to install an incandescent device. Installed distributive CV (Attn) strength and CV = 0 (shift) temporal strain. Surveillance can monitor CV international imports.
LIVE DEMO
A cradle for a store. View subtitles for contracts.